Peter @ Gowts School– Extension & Refurbishment
Timescale:
7 weeks each. Value:
£40k & £30k Project
: Extension and Toilet refurbishment at St Peter at
Client: Timescale:
16 weeks Value: £120k
Komfort
walling system, full height screening with internal blind. The offices where to
remain in use during the contract.
Timescale:
18 weeks Value: £150k Project: Design & build extension and remodelling: Master Bedroom with en-suite, dressing room, 3 Shower Rooms, fitted kitchen, dining room, study, sun room, utility room & WC. Oak flooring throughout, heating system, decoration and automated gates Client: Timescale:
9 weeks Value: £75k Project: Internal
remodeling of Student Union, Art department and various classrooms. Dance
studios and music rooms. Soundproofing, ground works and drainage.
Base
Two: Stripping out of existing fittings, breaking out dividing wall, new
benching and kitchen area. Art Department: Removal of gallery providing
cupboards at each end of the room. Student Support: Disabled access increasing
door opening to meet DDA requirements. Opening up entrance and kitchen area.
Early Years: New fenced yard. Performing Arts: Mirroring to end wall 15 mtrs x
2.4 mtrs. Garage base and drainage system to workshops. Improving electrics and
decoration to all areas.
Timescale:
12 weeks Value: £30K Project: New
reception office, waiting area, link corridor, disabled ramp and canopy. Bracebridge
Health - Domestic Extension
Built
over existing sitting room and garage
Scotter
Timescale:
12 weeks Value:
£50k Project:
Extension to form disabled ramps and WC. Install steel lintels over existing
openings and make good brickwork. Construct flat roof. Divert existing pipe
work. Construct wooden floor on hangers. New radiators, Install new door
openings, stud walls and casings. Fit new toilet, shower base and basin. Install
plaster boarding, plastering and skim walls. Paint to all walls, tiling in
toilet, reconnect existing drain pipes. Install ‘Polysafe’ flooring. Form
new disabled ramps to hall and play ground.
Client:
HBS / LCC Timescale:
20 weeks Value: £80k |