Some projects St
Peter @ Gowts School– Extension & Refurbishment
Timescale: 7 weeks each. Value:
£40k & £30k 2
Projects
: Extension and Toilet refurbishment at St Peter at New
reception entrance lobby, security, head office, extension to staff room and
disabled toilet. Raft foundation & flat roof. New lighting, cubicles, vanity
units, sinks and WC to children’s toilet areas.
Timescale:
16 weeks Value: £120k
Project:
New dismountable partitioning walling to construct offices, reception and
meeting rooms. Air conditioning, ducted air system, data cabling and electrical
installation. CAT2
Lighting, Komfort walling system, full height screening with internal
blind. The offices where to remain in use during the contract.
Timescale:
18 weeks Value: £150k Project:
Design & build extension and remodelling: Master Bedroom with en-suite,
dressing room, 3 Shower Rooms,
fitted
kitchen, dining room, study, sun room, utility room & WC. Oak flooring
throughout, heating system, decoration and automated gates Client: LCC/HBS Contract
Period: 19 weeks Contract
Value: £89k Project:
Extension to bungalow to provide additional bedroom, lounge, bathroom, new
study, utility room and cloakroom. Remodel external drainage. New footpaths and
landscaping. Client: Timescale:
9 weeks Value: £75k Project: Internal
remodelling of Student Union, Art Department, Dance Studios, Music Rooms and
various classrooms. Disabled access improvements to increase door opening to
meet DDA requirements. Garage bases and drainage systems to workshops. Improve
electrics and decoration to all areas.
Client:
LCC / HBS Timescale:
12 weeks Value: £30K Project: New
reception office, waiting area, link corridor, disabled ramp and canopy. Client: Extension
to rear of existing church hall to incorporate new entrance lobby and store
including construction of Disabled access ramp to new lobby area. Refurbishment,
extension and resurfacing of car park area including additional drainage. Bracebridge
Health - Domestic Extension
Project : 1st
Floor extension / Bedroom en-suite.
Scotter
Client:
HBS /LCC Timescale:
12 weeks Value:
£50k Project:
Extension to form disabled WC and ramps to Hall and
playground.
Timescale:
20 weeks Value: £80k Client:
Domestic Contract
Period: 12 weeks Contract
Value: £25k Extension
of existing property to incorporate new ground floor bedroom, shower room and
extension / remodelling of existing kitchen.
|