St Peter @ Gowts School– Extension & Refurbishment  

Client: LCC / HBS   

Timescale: 7 weeks each.

 Value: £40k & £30k

 

2 Projects : Extension and Toilet refurbishment at St Peter at Gowts School , High Street , Lincoln .

New reception entrance lobby, security, head office, extension to staff room and disabled toilet. Raft foundation & flat roof. New lighting, cubicles, vanity units, sinks and WC to children’s toilet areas.

 

 

Witham Park House – Internal Alterations

Client: Lincolnshire Highway & Planning

Timescale: 16 weeks  Value: £120k

 

Project: New dismountable partitioning walling to construct offices, reception and meeting rooms. Air conditioning, ducted air system, data cabling and electrical installation. CAT2  Lighting, Komfort walling system, full height screening with internal blind. The offices where to remain in use during the contract.

 

North Hykeham – Domestic Extension  

                                                        Client: Domestic

Timescale: 18 weeks

Value: £150k

 

Project: Design & build extension and remodelling: Master Bedroom with en-suite, dressing room, 3 Shower Rooms, fitted kitchen, dining room, study, sun room, utility room & WC. Oak flooring throughout, heating system, decoration and automated gates

Thoresby Close, Waddington, Lincoln  - Extension

Client: LCC/HBS

Contract Period: 19 weeks  

Contract Value: £89k  

Project: Extension to bungalow to provide additional bedroom, lounge, bathroom, new study, utility room and cloakroom. Remodel external drainage. New footpaths and landscaping.

Bishop Grosseteste College – Internal Remodelling

Client: Bishop Grosseteste College

Timescale: 9 weeks 

Value: £75k  

Project: Internal remodelling of Student Union, Art Department, Dance Studios, Music Rooms and various classrooms. Disabled access improvements to increase door opening to meet DDA requirements. Garage bases and drainage systems to workshops. Improve electrics and decoration to all areas.

Ash Villa School , Sleaford - Reception & Lobby  

Client: LCC / HBS

Timescale: 12 weeks

Value: £30K

 

Project: New reception office, waiting area, link corridor, disabled ramp and canopy.  

Lincoln Evangelical Church , Uffington Drive , Lincoln

Client: Lincoln Evangelical Church

 Contract Period: 9 weeks

 Contract Value: £41k  

Extension to rear of existing church hall to incorporate new entrance lobby and store including construction of Disabled access ramp to new lobby area. Refurbishment, extension and resurfacing of car park area including additional drainage.

Bracebridge Health - Domestic Extension

Client: Domestic  Timescale: 9 Weeks    Value: £25k 

Project : 1st Floor extension / Bedroom en-suite. Built over existing sitting room and garage, Structural steel work was required due the existing foundation been in adequate constructed to match existing house  

 

 

      Before & After

 

 

Scotter Primary School – Disabled adaptations

Client: HBS /LCC

Timescale: 12 weeks

Value: £50k

 

Project: Extension to form disabled WC and ramps to Hall and playground.

Leslie Manser School - New Entrance & Link Corridor

Client: HBS / LCC  

Timescale: 20 weeks Value: £80k

Project: Remodelling to form New Entrance and Link Corridor. The school had an original entrance around the back of the school facing the school playing field. The proposed scheme involved relocating the administration office, Head Teacher’s office, Deputy Head’s office, reception office, entrance lobby, entrance canopy and the inclusion of 30 metres of link corridor through the existing school and extension around the existing external courtyard. Alongside the relocation of services for IT points, security cameras, telephone points, fire alarm control panel and security alarm system.  

Sunfield Crescent , Lincoln - Extension

Client: Domestic  

Contract Period: 12 weeks  

Contract Value: £25k  

Extension of existing property to incorporate new ground floor bedroom, shower room and extension / remodelling of existing kitchen.

 

 

Email to sales@discontractors.co.uk with questions or comments about this web site.
Copyright © 2005 D.I.S Contractors
Last modified: January 23, 2008