This is only a small sample of projects

 

Lincolnshire County Council Offices - Rewiring

Internal remodeling of existing County Council Offices located in Orchard House & Newland Street, Lincoln,

Main Contractor: Topcon

Client: LCC / HBS

Contract Period:18 wks  Contract Value:    £150k

Project Brief:  

       

Removed all existing light fittings and installed new category 2 type fittings to conform to the LG3 including 

altering switches for new orientation of offices. 

Installed a 4 loop addressable Fire Alarm system with approximately 100 sounds and detectors. 

Installed new electric’s to lift and plant room. Installed data cabling and terminals.

 

Bishop Grosseteste College – Design and Installation

New Teaching Block at Bishop Grosseteste College Newport , Lincoln

Main Contractor: Linpave

Client: BGC

Contract Period: 14 wks. Contract Value:  £90k

 Project Brief:

Design & build specification for new teaching block incorporating: lecture theatres and seminar teaching rooms. 

Installation comprised of: New supply cable & MCCB installation, panel board & sub main cables, lighting & emergency lighting, 

external lighting, general purpose power & socket outlets, supply for ancillary services & telecommunications, 

electrical installation for mechanical services including extract fans, fire alarm installation,

 hand driers, lightning protection, intruder alarm, TV aerial installation, hearing loop installation, water savers and water heaters.

Boston Grammar School - New Build Installation

New Laboratory Block, Boston Grammar School Boston ,

Employer: L C C

Client: HBS / RG Carter

Contract Period: 30wks Contract Value:    £80

Project Brief:           

New  Physics and Chemistry Block. 

Electrical installation consisted of: Specialist safety transformers and sockets for the laboratories.

Installation of recessed modular fittings. Dado trunking, Emergency lighting and Fire Alarm installation.

Provision of sub mains and distribution boards.

 

Kipling Close – New Domestic Bungalows

 

Kipling Close, Macauley Drive , Lincoln

Main Contractor: Wrights Construction Ltd

Client: Lincoln City Council

Contract Period: 16 wks  Contract Value: £12k

 Project Brief:          

Re-development of land to erect 1No flat and 5No bungalows.

Provide new electrical installation to each domestic property. Time clocks, Boilers, smoke detectors, 

sockets and lighting, submain installation with consumer units. Dummy cameras, TV aerials, in-line kitchen fans and street lighting.

                                                    

Lincoln Cathedral Bishops Palace – Electrical Upgrade

Rewiring & Fire Alarm at Lincoln cathedral Bishops Palace , Eastgate, Lincoln

Main Contractor: Robert Woodheads Ltd  

Client: Church Commissioners for England     Contract Period: 12wks

Contract Value: £14k

 Project Brief:        

Supply and install fully integrated intruder alarm system with independent operation of the Bishop’s residence and office areas.

 Install a fully integrated fire and smoke alarm system with smoke/sounder in each bedroom. 

As the property is listed and of historic interest special consideration was taken in the placing of equipment and wiring. 

Provide external lighting to rear courtyard with movement sensors.

 

Horncastle Industrial Units – New Installation      

Electrical installation to 4 No. factory Units at Horncastle, Lincolnshire

 Employer: LCC

Client: Topcon Contract Period: 27 wks  Contract Value: £45k

 Project Brief:          

Supply the electrical installation to the new erection of 4 No. Factory units.

High Bay light fitting, trunking and tray work office lighting, street lighting. 

Supply sub mains, switchgear and landlords supply. Distribution boards, Electrical supplies for mechanical

 

Queen Elizabeth High School Gainsborough – CDT & Technology areas

Internal remodelling of Technology Room at Queen Elizabeth High School Morton Terrace, Gainsborough

Main Contractor: T G Sowerby

Client: LCC   Contract Period: 16 wks  Contract Value:    £81k

 Project Brief:        

Removal of existing switch gear and installation of new in the main switch room. 

Complete installation of mains distribution & control equipment. 

Install & connect new sub-main cables and distribution board. 

Position new electrical points, switches, sockets. 

Complete lighting installation of specified luminaries.

Installed a 4 loop addressable Fire Alarm system with sounds and detectors.

 

Lincoln County Hospital – Fire Alarm System

Replace Maternity Wing fire alarm panel and rewiring of the basement detectors at

Lincoln county Hospital , Greetwell Road , Lincoln .

 

Employer: United Lincolnshire Hospital NHS Trust

Client:  Estates Department

Contract Period: 12 wks.  Contract Value:  £24k

 Project Brief:

To supply, install and commission a new Gent 4-loop fire alarm panel located in the lobby of the maternity wing entrance. 

Install a powered loop interface unit in the service riser on each level. 

Swap over the fire alarm/detector and relay circuit from the existing junction terminal boxes to the new interfaces. 

Set up the Fire Alarm matrix. 

Installed a new Gent Vigilon addressable panel using existing bells and conventional smoke detector/break glasses. 

Removal of existing system on completion of new installation. Replaced detectors, cable and electronic sounders in the basement.

St Marks Lincoln – New Residential Flats

Electrical Fit-out to 10No flats  

Main Contractor:

Client: Simons Est. Contract Period: 5wks Contract Value:    £37k

 Project Brief:          

Electrical installation to 10No flats within an existing shell building at 1st & 2nd floor levels. 

Install ventilation fans to kitchen, bathrooms and toilets. 

Install storage heaters in living rooms, kitchens and dining rooms.

Install a fire detection and alarm system in accordance with BS 5839. Install mains operated smoke alarms.

Install Emergency lighting to all escape routes. BT & TV connection in each dwelling. 

Provide door entry phone system using digital code entry pad.

Also phase 2 Quay St Marks

 

 

 

Posthouse Forte – Electrical Upgrades

Hotel refurbishment @ Ipswich, Preston , Haydock & Norwich

                                                                                                                                                                                                                                Kipling Close, Macauley Drive , Lincoln

Employer: Simons Construction

Client: Posthouse Forte  Contract Period: 16 wks Contract Value: £144k

 Project Brief:          

Electrical supplies in bedrooms to: lampshades, hairdryers, trouser presses, switches, sockets, wall lights, mini bar, 

BT sockets, heated towel rails, shaver sockets. Provide conduit for fire alarm and reposition 

Fire Alarms. Install surface and recessed light fittings and illuminated emergency light fittings in the corridors. 

Carry out all bonding, testing and certification as necessary.

                                                      

Wellington Court & Lancaster Court – New Build Installation

Residential Development of 15No / 8No flats Lincoln High Street

 

                                                Client: D’arcy International

Contract Period: 12wks & 16wks

Contract Value: £46 & 25K

 

Project Brief:        

Wiring to 15No  & 8No flats incorporating: Fire Alarm, outside lights, Hallway & landing lighting and emergency lighting. 

TV points with amplifiers and aerials. BT sockets, wiring to showers, fans, installation of pendants.

 Installation of smoke detectors in roof space. Wiring for bells. 

Ducting for kitchen supplies and supplies for meter boxes.

Transco – Electrical Office Refurbishment

Conversion of former workshop into Offices at Transco Dept Clayton Road , Lincoln

 

Contract Period: 7 wks

                                                Contract Value: £30k

 

 

      

Provide basic installation of CAT2 lighting and power on dado trunking to open plan office, 

Fire Alarm system, 

Air Conditioning and ducted air, distribution boards & CCTV installation.

  

 