projects The Cottage Residential Home, Nocton - 6 Bed extension & Lounge
Timescale: 16 weeks (completed in 12 weeks) . Value: £140k
Remove the existing flat roof off a single story 5 bedroom block lowering walls and construction of 6 bedrooms with en-suite, link corridors and fire escape ( Timber Frame) Plus 25M² side extension seating lounge( Brick & Block) Including lighting, power , heating, plumbing, fire alarm, emergency lighting and addressable nurse call NOTE: The existing five bedrooms where only out of action for 6 weeks St Peter @ Gowts School– Extension & Refurbishment
Timescale: 7 weeks each. Value: £40k & £30k 2 Projects : Extension and Toilet refurbishment at St Peter at Gowts School , High Street , Lincoln . New reception entrance lobby, security, head office, extension to staff room and disabled toilet. Raft foundation & flat roof. New lighting, cubicles, vanity units, sinks and WC to children’s toilet areas.
Witham Park House – Internal Alterations
Timescale: 16 weeks Value: £120k
Project: New dismountable partitioning walling to construct offices, reception and meeting rooms. Air conditioning, ducted air system, data cabling and electrical installation. CAT2 Lighting, Komfort walling system, full height screening with internal blind. The offices where to remain in use during the contract.
North Hykeham – Domestic Extension
Timescale: 18 weeks Value: £150k
Project: Design & build extension and remodelling: Master Bedroom with en-suite, dressing room, 3 Shower Rooms, fitted kitchen, dining room, study, sun room, utility room & WC. Oak flooring throughout, heating system, decoration and automated gates Thoresby Close, Waddington, Lincoln - Extension Client: LCC/HBS Contract Period: 19 weeks Contract Value: £89k Project: Extension to bungalow to provide additional bedroom, lounge, bathroom, new study, utility room and cloakroom. Remodel external drainage. New footpaths and landscaping. Bishop Grosseteste College – Internal Remodelling Client: Bishop Grosseteste College Timescale: 9 weeks Value: £75k Project: Internal remodelling of Student Union, Art Department, Dance Studios, Music Rooms and various classrooms. Disabled access improvements to increase door opening to meet DDA requirements. Garage bases and drainage systems to workshops. Improve electrics and decoration to all areas. Ash Villa School , Sleaford - Reception & Lobby
Timescale: 12 weeks Value: £30K
Project: New reception office, waiting area, link corridor, disabled ramp and canopy. Lincoln Evangelical Church , Uffington Drive , Lincoln Client: Lincoln Evangelical Church Contract Period: 9 weeks Contract Value: £41k Extension to rear of existing church hall to incorporate new entrance lobby and store including construction of Disabled access ramp to new lobby area. Refurbishment, extension and resurfacing of car park area including additional drainage. Bracebridge Health - Domestic Extension Client: Domestic Timescale: 9 Weeks Value: £25k Project : 1st Floor extension / Bedroom en-suite. Built over existing sitting room and garage, Structural steel work was required due the existing foundation been in adequate constructed to match existing house
Before & After
Scotter Primary School – Disabled adaptations
Timescale: 12 weeks Value: £50k Project: Extension to form disabled WC and ramps to Hall and playground. Leslie Manser School - New Entrance & Link Corridor
Timescale: 20 weeks Value: £80k Project: Remodelling to form New Entrance and Link Corridor. The school had an original entrance around the back of the school facing the school playing field. The proposed scheme involved relocating the administration office, Head Teacher’s office, Deputy Head’s office, reception office, entrance lobby, entrance canopy and the inclusion of 30 metres of link corridor through the existing school and extension around the existing external courtyard. Alongside the relocation of services for IT points, security cameras, telephone points, fire alarm control panel and security alarm system. Sunfield Crescent , Lincoln - Extension Client: Domestic Contract Period: 12 weeks Contract Value: £25k Extension of existing property to incorporate new ground floor bedroom, shower room and extension / remodelling of existing kitchen. |
|